Here’s a recap of last week’s progress:

Lots of construction work happening in the 1st floor entry area. The carpenters were building out the wall that separates the entry lobby from the trash room. There will be 3 built-in display cases on this wall.

A view from inside out from the 2nd floor lounge. The double doors open out onto a 7′ x 16′ balcony – this will be a great spot for coffee breaks.

And the outside view.

Getting ready to install the kitchen cabinets and counter in the lounge.

The fire department connection to the new sprinkler system.

We have new exterior emergency exit doors at the left and right of the building.

The walls surrounding the windows in the handbuilding room have new insulation, drywall and plaster.

The glass window wall in the office has been installed.

Elevator installation is complete – with numbers for the floors.

Advertisements
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s