April 28, 2011

Norm and Kent began construction this week of the decorative marquee brackets. They are preparing all the parts that will be the frame and interior bracing, and the decorative ball hanging at the bottom. On Tuesday, the entry way looked … Continue reading

Posted in Uncategorized | Leave a comment

April 24, 2011

Lots of electrical work happening now – with many boxes of supplies on hand. The new overhead fixtures in the atrium and proscenium areas have been installed. Setting up to install the fire alarm boxes in the lobby. The lobby … Continue reading

Posted in Uncategorized | Leave a comment

April 19, 2011

A new exterior door has been installed at the rear emergency exit. The electricians have mounted the new lighting fixtures for the first floor display walls. Sheetrock work has begun in the entryway; the plasterers will be up next here. … Continue reading

Posted in Uncategorized | Leave a comment

April 12, 2011

Some dramatic changes happening quickly now as we near the end of the project. Here’s new work from the past day and a half! We have a new counter and cabinets in the lounge. Sink and refrigerator yet to come. … Continue reading

Posted in Uncategorized | 1 Comment

April 11, 2011

Here’s a recap of last week’s progress: Lots of construction work happening in the 1st floor entry area. The carpenters were building out the wall that separates the entry lobby from the trash room. There will be 3 built-in display … Continue reading

Posted in Uncategorized | Leave a comment

April 1, 2011

The Marquee Decorative Bracket Fabrication team was on site last Wednesday to check out the framing for the entryway. Kent, Norm and Richard met with Joe and Tony to review the design and make a plan for the construction and … Continue reading