March 29, 2011

Framing work has begun on the entry and the new marquee.

Looking up at the light fixture installation.

The new trash room getting framed up in the entry. Display cases will be built into this wall. The tiles that we have asked everyone to make will be installed on this wall too.

Elevator installation has been underway for the past 2 weeks – installing the mechanicals and doors and framing,  and eventually building the cab in the shaft.

The millworkers delivered and installed the handrail around the 2nd floor atrium railing.

The cabinets and counter for the lounge were delivered last week too.

The framing and glass have been installed in the 2nd floor lounge, separating the lounge from the exterior balcony. The wood will be removed as soon as the balcony railing can be installed.

The carpenters have built the new staircase at the rear of the building for the emergency exit.

Some bigger views of the first floor spaces – looking from the rear of the building towards the front entryway.

The back left classroom area with the rear exit.

The back right area – clay storage and cart corral – with the rear door into the kiln room.

The front hallway – elevator, utility room, and 2 bathrooms.

Advertisements
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s