March 22, 2011

The RTU is in place on the roof and interior installation is underway.

It’s very complicated looking on the inside – we’ll have to call in the pros if this needs any repairs.

The new skylight has also been installed.

An interior view – it will bring light down behind the proscenium.

The 2nd floor Wheel 2 classroom with newly plastered walls.

Giant springs for the elevator installation.

The painters are hard at work on the 2nd floor studio walls and now the main staircase.

The millwork installers were on site today, putting up the hallway shelves outside the studios. Looks like we need some pottery on all those shelves!

 

Advertisements
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s