March 9, 2011

We have permanent power!! We’ve been waiting quite a while for this to happen – thank you NSTAR! Now the elevator contractor can install the elevator cab in the shaft and make sure it works, and the electricians can connect all the wiring and electric panels.

In the meantime, we’ve been conducting tours of the building – for our students and board members.

The carpenters are framing up the wall the separates the lounge from the small wheel classroom, and then it gets sheetrock and plaster.

Imagine the kitchen here – counters, cabinets, sink and refrigerator.

Yesterday they delivered our wood and metal doors – 42 of them – plus hardware and locks.

Advertisements
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s