September 27, 2010

Work scheduled for this week includes more steel and concrete blocks. The steelworkers will be installing the rest of the beams for the second floor, followed by the metal decking on top that will support the concrete slab. And the elevator shaft construction continues.

And one more photo of the stairs, because I think they are so cool. Can you picture the bamboo treads?